The survey was conducted by the foundation’s team to obtain data on the location and readiness of the community groups
We carry out visits to every village that has submitted an application to ensure that the location point is appropriate, in addition to measuring the ground level with an altimeter to ensure that water from the main tank can be channeled into the reservoir which will later be built.
Ensuring the readiness of residents and their ability to build, maintain and maximize the use of water facilities is also an important point.