Steel pole starts upright attached at Mbinudita

September 28, 2020
As one of the main materials that is very vital, specifically we have to come from Surabaya through container ships, to provide strength and durability to the structure of the building.

As one of the main materials that is very vital, specifically we have to come from Surabaya through container ships, to provide strength and durability to the structure of the building. Today with the hard work of day and night has begun to look upright standing the steel pole pole from the first column towards the column column of other structures.

Being rumored or the material of the sgunjingan in Sumba, that this will be the most dashing primary school that is strong and strong in east Sumba. A strong school is not our primary goal, but the basic right to receive a decent education for children is a priority.

We start from building a Mbinudita that is ready and upright.

#BangunMbinudita

 

News

Installation of pipes from the school to the villages of Paddi, Womarru and Kokur
January 19, 2023

Installation of pipes from the school to the villages of Paddi, Womarru and Kokur

From the survey results of visits by the Foundation team to a number of locations, an ideal plan has been...
read more
Skin Diseases That Are Part of the Lives of East Sumba Residents
January 16, 2023

Skin Diseases That Are Part of the Lives of East Sumba Residents

We invite Good Friends to join in donating, spreading smiles for our friends in East Sumba so that skin diseases...
read more
Building Healthy Living Habits in East Sumba
January 6, 2023

Building Healthy Living Habits in East Sumba

We hope that education and access to health in East Sumba can be resolved gradually with this program.
read more
Well Point Survey
January 2, 2023

Well Point Survey

From the survey results of visits by the Foundation team to a number of locations, an ideal plan has been...
read more